Express Solutions
Purchase a pre-designed layout or express service to have an updated kitchen or bathroom in one to two weeks!
Prices for full service are listed in the product title. Down payment prices are added to the cart for checkout and scheduling. Labor and materials are included in the price.
Bathroom
Labor & Materials: Using Shower Surround Wall - Remove the tiles in the shower and all the fixtures from the bathroom. Install new Delta Bathtub & shower surround wall, delta shower fixture, American Standard Toilet, 36" Vanity cabinet with cultured marble top, delta sink faucet, vanity mirror, vanity light fixture, towel bar and toilet paper holder. Install vinyl plank flooring over existing flooring & a new door threshold. Paint the bathroom with owner’s choice of color. (Shower Door Additional). Wall tiles not included.
A down payment of $200 is required at checkout. 50% of payment required a week prior to job start. Tax not included in listed price.
Install a frameless shower door. Labor and materials included.
A down payment of $100 is required at checkout. 50% of payment is required a week prior to the job start. Tax not included in listed price.
Remove the existing toilet and install a new toilet. The old Toilet is placed at the curb for local pickup.
A down payment of $25 is required at checkout. 50% of payment is required a week prior to the job start. Tax not included in listed price.
Remove the vanity faucet and install a new Moen Vanity Faucet
A down payment of $25 is required at checkout. 50% of payment is required a week prior to the job start. Tax not included in listed price.
Kitchen
Remove the cabinets and install new white (gray, expresso) cabinets, tile backsplash, quartz countertop, and kitchen faucet, reconnect your dishwasher and garbage disposal to the sink. Appliance and fixtures not included.
A down payment of $200 is required at checkout. 50% of payment is required a week prior to the job start. Tax not included in listed price.
Install new Kohler/Delta kitchen faucet. Materials and labor included.
A down payment of $25 is required at checkout. 50% of payment is required a week prior to the job start. Tax not included in listed price.
Replace the over-range microwave. Owner to provide the new microwave. Labor included.
A down payment of $25 is required at checkout. 50% of payment is required a week prior to the job start. Tax not included in listed price.
Remove the caulking at the countertop and re-caulk with the owner's choice of color.
Materials and labor are included. A down payment of $25 is required at checkout. 50% of payment is required a week prior to the job start. Tax not included in listed price.
Flooring
Min. 120 sqft
Install vinyl plank flooring over tiles or on basement flooring. Tax, demolition, and disposal additional.
Min. 120 sqft
Install vinyl plank flooring over tiles or on basement flooring. Tax, demolition, and disposal additional.
Min. 120 sqft, 3-1/4" thick
Install hardwood flooring on plywood subflooring. Tax, Demo and disposal additional
Install new 8 lbs. carpet pad and 3.5 density carpet. Tax, demolition & disposal additional.